Related Topics and Links:

Introduction to MPC

Systems and Powerplant Analysis

Structural Analysis

Zonal and L/HIRF Analysis

All MSG-3 Analyses

This chapter discusses several common features that are similar in all MSG-3 analyses and/or must be determined up-front for the entire database. This includes:

For features that are specific to a particular type of analysis, see Systems and Powerplant Analysis, Structural Analysis or Zonal and L/HIRF Analysis.

Time Units

In MPC, the time units (defined in the Time and Usage Units window) can be used in the Interval field for maintenance task records, if desired. Some of the reasons why you might choose to define the task interval with a number and time unit (instead of a text field that places no constraints on how users type information):

Tip: When you convert an existing analysis project from MPC 3, the Tasks Conversion window allows you to decide whether the imported tasks will continue to define the intervals in text fields or if you prefer to convert the existing records to use numerical values with predefined time units.

 

© 1992-2017. HBM Prenscia Inc. ALL RIGHTS RESERVED.

E-mail Link