Related Topics and Links:

All MSG-3 Analyses

Task Type Abbreviations in MPC

In MPC, the task types defined for the database must be consistent with the task selection logic specified in the MSG-3 guidelines. This means that it is not possible to add or delete task types, nor can the names be changed. However, because there is some variability among MSG-3 practitioners regarding the abbreviations used, the software does provide the option to modify the abbreviations, if desired.

To define the task type abbreviations, choose File > Manage Repository > Task Types.

(In a secure database, this is available only to users with the "Manage other repository settings" permission.)

  

 

© 1992-2017. HBM Prenscia Inc. ALL RIGHTS RESERVED.

E-mail Link