Related Topics and Links:

Ribbons

Analyses Tab

The Analyses tab contains the following commands.

Planning

  Add Risk Discovery adds a tab in the Analysis panel for the risk discovery analysis associated with the selected item.

  Add Analysis Plan adds a tab in the Analysis panel for the analysis plan associated with the selected item.

  Add P-Diagram adds a tab in the Analysis panel for the Parameter Diagram (P-Diagram) associated with the selected item.

FMEA

  Add FMEA adds a tab in the Analysis panel for the failure modes and effects analysis (FMEA) associated with the selected item.

  Add Linked FMEA opens the Add Linked FMEA window, which allows you to select an existing analysis that is eligible to be linked from the current item.

  Add DRBFM adds a tab in the Analysis panel for the design review based on failure modes (DRBFM) analysis associated with the selected item. It will be visible only if you have selected the option on the Configurable Settings page of the Project Properties window.

Other

  Add DVP&R adds a tab in the Analysis panel for the design verification plan (DVP&R) analysis associated with the selected item. It will be visible only if you have selected the option on the Configurable Settings tab of the Project Properties window.

  Add PFD Worksheet adds a tab in the Analysis panel for the process flow diagram worksheet associated with the selected item.

  Add Control Plan adds a tab in the Analysis panel for the control plan associated with the selected item.

 

© 1992-2019. HBM Prenscia Inc. ALL RIGHTS RESERVED.

E-mail Link