Related Topics and Links:

Configure RD Questions

Configure RD Ratings

Project Properties


 Preliminary Risk Assessment

 Risk Discovery Analysis in XFMEA

Risk Discovery

The Risk Discovery tab in the Analysis panel allows you to perform a preliminary analysis that can help you select the equipment that will receive more detailed analysis.

There are two configurable methods available for performing this analysis; the one you use depends on your choice in the project properties.

Whichever method is selected, the goal of this task is to provide a systematic approach to focus limited analysis resources where they will provide the maximum benefit and ensure the highest return on investment.

To add a Risk Discovery analysis, select an item in the System panel then choose Analyses > Planning > Add Risk Discovery.

The Risk Discovery tab will open in the Analysis panel. In addition, the Risk Discovery icon will appear in the corresponding column in the System Hierarchy tab of the System panel while the Risk Discovery value will appear in the Risk Discovery Details column (if those columns have been selected for display on your computer).

Showing Results in the System Panel

In the System panel, the Risk Discovery column displays a green icon if a Risk Discovery analysis is associated with the item. Additionally, if the Mark item for more detailed analysis check box is selected at the bottom of the Risk Discovery analysis, then the Risk Discovery icon will display in red.

In the System panel, what the Risk Discovery Details column displays depends on the Risk Discovery type:

Generating a Report

To generate a report of the Risk Discovery data, choose Home > Reporting > Reports.

In the Reports window, select any of the predefined report forms under the Risk Discovery heading.

 

© 1992-2019. HBM Prenscia Inc. ALL RIGHTS RESERVED.

E-mail Link