
![]() |
||
The FMEA tab is visible when you are working in the FMEA tab in the Analysis panel. This tab can be used to perform a Failure Modes and Effects Analysis or to record the Functional Failure Analysis for RCM.
Attachments
allows you to manage the linked or attached
files for the selected record.
Highlight Priority
if selected, uses color to highlight the FMEA records based on logic that
has been defined for the project. (See Priority
Highlights.)
Ratings Update
opens the Batch Update Revised RPN Rating
window, which allows you to quickly populate the revised RPN ratings
in the FMEA records.
FMEA Statistics
opens the FMEA Statistics window,
which displays some overall statistics for the FMEA. This includes details
such as the total number of causes defined in the analysis, the percentage
of causes that have the RPN ratings defined, the total number of actions
defined in the analysis, the percentage of actions that are complete,
etc.
Failure - Cause
Matrix opens the Failure - Cause
Matrix window, which displays the unique failure modes and causes
that have been defined in the FMEA. This matrix helps to see when the
same cause has been identified for more than one failure mode.
Export to Phrase Set
Export to a New FMEA Phrase Set allows you to export the descriptions from the current FMEA to a new phrase set in the active library. (See Phrase Sets.)
Export to an Existing FMEA Phrase Set allows you to export the descriptions from the current FMEA to an existing phrase set.
Configurable Settings
opens the Properties window where
you can change the properties that are available for the FMEA records
in this project.
History Log
is available only if a history log has been activated at the project level.
It opens the Record History Log window
for the current analysis and displays changes that have been performed
for the analysis.
Activate Change
Log or View Change Log
allows you to activate or view a change log
for this FMEA analysis. A change log records a history of the specific
changes that were made in each tracked revision to the analysis since
the log was activated.
Approve Change Logs
displays a list of all the FMEA change logs in the project that are assigned
to you for approval and are ready to be approved. (See Electronic
Approval Tracking.)
© 1992-2018. HBM Prenscia Inc. ALL RIGHTS RESERVED.
![]() |
E-mail Link |