This topic describes how to use resource wizards to create and edit Synthesis resources while you’re performing an analysis or creating a URD. In addition, you may also need to:
Use the Resource Manager to see all of the resources that are available to use in the current project. In addition to creating and editing resources, the manager also allows you to:
Delete resources that are no longer needed.
Create global resources that are available to all projects in the database.
Publish a model that is linked to an existing analysis.
Throughout all Synthesis applications, the availability of a resource wizard is usually indicated by an ellipsis (...) or an arrow in the resource field. Simply click twice in the field to open the wizard.
Each wizard contains multiple pages with different options on each page. If the option you need is not immediately visible, you can click the Back arrow to see the Main page, which shows all the options that are applicable for the current situation.
As an example, the following pictures show some of the different options that will be available on the Main page for specific situations and resource types.
If a model hasn't been defined... |
If a task hasn't been defined... |
If a task has already been defined... |
The Select page of the wizard displays a list of existing resources that meet the criteria specified on the Settings page. You can then further limit the list by typing inside the text box.
As an example, the following pictures show a situation in which the settings are configured to display up to 2,000 models (more resources take longer to load) from the current project only (called local resources), and the user has selected to see only the ones in which the name includes “bulb.”
In addition, for model resources only, you must specify whether you want to display the model parameters in the list (which also takes longer to load); and if so, the number of decimal places (called Parameter Precision) and the point at which the software will switch to scientific notation (called Parameter Tolerance).
To change the initial criteria for the list, click the Back arrow and then click the Settings button on the main page.
Alternatively, if you need more information about the available resources and/or a wider range of filtering tools, you can click the icon to open the Select Resource window.
In most wizards, you can click the Create New button or icon to create a new resource.
In the model wizard, click the button or icon for the type of model you want to create:
New Constant
New Distribution
New Dynamic
If a resource has already been assigned, you can view and/or edit its properties by clicking the View/Edit button or icon.
If you have the permissions needed to edit the resource, any changes you make will apply everywhere that the resource is used. This includes analyses in other Synthesis applications.
If a resource has already been assigned, you can remove it from this location by clicking the Remove button or icon.
The resource will remain in the database for use in other locations. If you want to completely remove a resource from the database, you’ll need to use the Resource Manager or Select Resource window.