Related Topics: | ||
Description: Returns the cost for spare parts due to on condition tasks that accrued during the simulation time. Pool costs are based on the direct cost per item as specified in the Spare Part Pool window, as well as any indirect costs (e.g., holding costs, costs associated with restocking, etc.).
Syntax: sr_costs_pool_oc(sim_definition)
sim_definition is the name of the simulation definition that you are running.
© 1992-2015. ReliaSoft Corporation. ALL RIGHTS RESERVED.