Related Topics and Links:

Synch Options for New DVP&Rs

Synch Options for Existing DVP&Rs

Synchronizing a DVP&R with a DFMEA

You can choose to transfer data automatically from the FMEA each time that you create a DVP&R analysis. In this case, the logic is set in the interface style that has been defined for the project. You can also manually sync at any time. In this case, the logic is set in the Synchronization Options window.

Please note that the data is transferred, not linked. Changes made in the FMEA do not appear automatically in the DVP&R and vice versa. The synchronization functionality is intended to provide you with a starting point for the DVP&R by transferring relevant data from the FMEA. You can then make any necessary modifications and additions to the DVP&R.

The following data from the analysis can be transferred to the header or worksheet area in the DVP&R.

FMEA

DVP&R

Item Number/Item Name

Part Name/Description (Header tab)

Model Year(s)/Program(s)

Model Year/Program (Header tab)

Control Number or Action Number

Test Request # (Worksheet tab)

Current Design Controls or Recommended Actions

Test/Specification Method (Worksheet tab)

Cause Class

Classification (Worksheet tab)

Action Due Date

Planned Start (Worksheet tab)

Action Person Responsible

Assigned To (Worksheet tab)

 

© 1992-2017. HBM Prenscia Inc. ALL RIGHTS RESERVED.

E-mail Link