Related Topics and Links:

Configurable Settings

Risk Discovery Ratings

For risk discovery analysis (e.g., preliminary risk analysis, change point analysis, equipment selection, etc.), you can choose to use either questions or ratings.

The risk discovery ratings method uses a set of factors and ratings that calculate a numerical value. New in Version 11, you can specify how the ratings will be calculated.

The RD Ratings page in the Profiles/Library Manager shows all of the predefined sets of risk discovery ratings in the active library.

If you want to view/modify the risk discovery ratings for a particular project:

Remember that changing the settings in an individual project does not automatically update the library or any other projects (Learn more...). Also note that these options will be disabled if you have selected to use questions rather than ratings for the current project.

Editing a Set of Risk Discovery Ratings

The Calculation Methods area specifies how the rating will be calculated for each category defined in the table and for the item overall.

Using a simplified example, the following settings would calculate the Safety rating (Potential for Injury x Severity of Injury) and the Maintenance Rating (Downtime + Repair Costs), and then calculate the overall Item rating as Safety + Maintenance.

To edit any existing entry, simply type directly in the table cell.

To add or delete a category, factor or option, click inside an appropriate cell and then use the buttons under the table. For example, if you want to add another option above "Moderate" in the "Repair Costs" rating scale, click inside any of the three cells for that option and then click Insert Option to insert a new row above.

To import a set of ratings that have already been defined in another project or library, click Copy Existing.

 

© 1992-2017. HBM Prenscia Inc. ALL RIGHTS RESERVED.

E-mail Link