
The minimum data requirements for analysis of developmental multi-phase data are presented next:
|
Data Type |
Minimum Requirements |
Models |
|
Failure Times |
At least 3 unique failures. |
Crow Extended - Continuous Evaluation: maximum of 10 phases |
|
Grouped Failure Times |
At least 3 unique failures. |
Crow Extended - Continuous Evaluation: maximum of 10 phases |
|
Mixed Data |
At least 3 intervals with at least 1 failure in each BD modes - at least 3 unique |
Crow Extended - Continuous Evaluation: maximum of 10 phases |
© 1992-2017. HBM Prenscia Inc. ALL RIGHTS RESERVED.
![]() |
E-mail Link |