ARINC Allocation Model

When you select the ARINC allocation model in the Allocation utility, the Elements field in the control panel will update automatically to display the number of blocks that you have selected to include in the analysis (i.e., the number of check boxes that are selected in the Include column of the table).

In the Reliability Goal field in the control panel, enter the desired overall reliability for the system (expressed as a decimal from 0 to 1, excluding 0). In the Operating Time field, enter the length of time the system will operate, in hours. Click the Calculate icon on the control panel to obtain the results.

The following results will be displayed in the table for each block selected to be included in the analysis:

About the ARINC Allocation Model

Description:

where:

The steps are as follows:

where λ can be obtained by:

where:

 