The Simulation Summary worksheet for simulation diagrams displays the details of the simulation.
Diagram: The name of the diagram that was simulated.
Simulation Start Time: The date and time that the simulation process began.
Simulation Duration: The total amount of time that the simulation process took.
Start Time: The simulation start time, as defined in the Maintainability/Availability Simulation window. This field is available only for interval simulations.
End Time: The simulation end time, as defined in the Maintainability/Availability Simulation window.
Run Options: The type of simulation that was run (i.e., standard simulations or log of simulations).
Number of Simulations: The total number of simulations that were performed on the system, as defined in the Maintainability/Availability Simulation window.
Seed Value: The seed value, if any, as defined in the Maintainability/Availability Simulation window.
Number of Threads: The number of threads used during the simulation.
© 1992-2019. HBM Prenscia Inc. ALL RIGHTS RESERVED.
E-mail Link |